Crew diary Midweek slots are open through October, and every quote request sent before 6pm gets a written reply the same working day. Ask for yours.
Cedar StudioMovers Get a quote
A bright, tidy living room with a pale sofa and open windows, set up after a completed move

Home & office relocation

Your last box lands where you want it


Cedar Studio plans the move before the truck arrives: a walkthrough, a written quote, a packing list, and one move lead who stays with the job from the first carton to the final walk-through.

  • Flats & houses
  • Office & studio
  • Storage shuttle
  • Single heavy items

Move types

Four kinds of job, priced differently


Every move is quoted per job rather than from a fixed list, because access, volume and timing change the crew size far more than the distance does. Start with the lane that sounds like yours.

Lane 01

Homes and apartments

The standard job: one address to another, packed either by you or by our crew the day before. We carry wardrobe cartons on the truck so hanging clothes travel upright, and beds, dining tables and flat-pack desks are taken apart and rebuilt in the new room.

Crew of 2–4Half day to full day, depending on volume and lift access.

Lane 02

Office and studio

Planned around your downtime rather than ours. Desks are labelled by seat, cables are bagged to their machine, and the server or studio kit moves in a separate protected run. We work evenings and weekends when the building allows it.

Out-of-hours availableFloor plan and seat labels agreed in the walkthrough.

Lane 03

Storage shuttle

For the gap between completion dates. We load, hold your goods in a wrapped, inventoried container and deliver on the day you confirm. You get the inventory list before the container is sealed, so you know what is where.

Two moves, one planFirst two weeks of holding are included in the quote.

Lane 04

Single heavy items

A marble table, a safe, a treadmill, a wardrobe that will not turn the stair corner. We measure the route first and tell you honestly whether it goes through the door, up the stairwell, or needs to be dismantled.

Measured before bookingRoute photos or measurements requested at quote stage.

How a move runs

Four stages, and what you do in each


Most of the stress in a move comes from not knowing what happens next. This is the sequence we follow on every job, and the part that stays with you.

01

Walkthrough

A room-by-room look, in person or over a video call, so the quote is based on what is actually there.

  • Volume and awkward items noted
  • Lift, stair and parking access checked
  • Written quote with the crew size
02

Prep week

Materials are dropped off and the plan is confirmed. You decide how much packing you want to hand over.

  • Cartons and covers delivered
  • Labels agreed by room or seat
  • Building forms and lift booking listed
03

Load day

The crew protects the route first, then works room by room so nothing is left to a last-minute sweep.

  • Floor runners and doorframe guards
  • Soft furniture wrapped, then blanketed
  • Inventory ticked as the truck fills
04

Place & check

Boxes go to the room on the label, furniture is rebuilt, and we do not leave until you have walked the place.

  • Beds and tables reassembled
  • Cartons stacked, not dumped
  • Final walk-through and sign-off

What's covered

Inside the price, and outside it


A quote is only useful if it holds on the day. Here is what every Cedar Studio quote already contains, and the handful of things we price separately so they never arrive as a surprise line.

In every quote

  • A named move lead for the whole job
  • Crew, truck, fuel and tolls
  • Blankets, straps and trolleys
  • Floor runners and doorframe guards
  • Wrapping for sofas, mattresses and chairs
  • Dismantle and rebuild of standard beds, tables and flat-pack desks
  • A written inventory of what was loaded
  • Placement by room label and a final walk-through

Quoted separately

  • Full packing service, if you want the crew to pack for you
  • Storage beyond the first two weeks
  • Specialist items: pianos, safes, large aquariums, mounted art
  • Extra pickup or drop-off stops added after booking
  • Disposal or donation runs for what you are leaving behind
  • Out-of-hours access where the building charges for it
  • Crane or window hoist where the stairwell will not take an item

Materials & handling

What we pack things in


Useful if you are packing yourself. These are the materials we drop off in prep week and how each one is meant to be filled.

Book carton
Double-wall, small on purpose. Books, files, tools and tinned goods. If two people cannot lift it comfortably, it is overfilled — spread the weight across two.
Standard carton
The everyday box for linen, kitchenware and clothing that is not on hangers. Fill to the top so it stacks; a half-full box collapses under the one above it.
Wardrobe carton
Carries a hanging rail, so suits, dresses and coats travel upright and go straight into the new wardrobe. Brought on the truck and taken away again.
Glass & ceramic pack
Cell dividers and paper for stemware, plates and vases. Plates stand on their edge rather than lying flat — they survive the trip far better that way.
Mattress & sofa covers
Fitted covers that go on before anything leaves the bedroom, then stay on through the stairwell and the truck. Reused, not disposable.
Screen & art protection
Corner blocks, foam sheet and a flat carton for televisions, monitors and framed work. Screens travel standing upright, never laid on their back.
Route protection
Floor runners, doorframe guards and stair mats, laid before the first item moves. Part of the quote, not an add-on.

Request a quote

Tell us the shape of the job


Six answers are enough for a first figure. If the job needs a closer look, we will suggest a walkthrough — video is fine — before anything is confirmed.

  • A written quote, with the crew size and hours it assumes
  • The materials list you will need for the rooms you described
  • The dates our crews currently have open around yours
  • No booking is held until you reply and confirm

We use what you send here to prepare your quote and nothing else.

Before you book

Questions we are asked most


How is a move priced?

By the crew hours the job realistically takes, adjusted for volume, access and timing. Stairs, long carries from the parking bay and a tight lift add hours; a ground-floor flat with a loading bay takes fewer. That is why we quote per job rather than publishing a rate card that would be wrong for half of you.

How far ahead should I book?

Three to four weeks for a weekend or a month-end date, which are the two busiest windows. Midweek moves can often be fitted in within a week. If your dates are still moving, tell us the range and we will hold a provisional slot.

Do I need to empty drawers and wardrobes?

Empty anything with glass, anything that slides open, and any drawer heavy enough to change how the piece lifts. Light clothing can usually stay in a solid chest of drawers. Hanging clothes do not need packing at all — they go straight into our wardrobe cartons on the day.

What happens if it rains on move day?

We keep working. Upholstery and mattresses are already covered, cartons are shrink-wrapped on the trolley, and extra runners go down on both ends to keep the floors clean. We only reschedule when conditions make the carry genuinely unsafe, and that call is made with you the morning of.

Can you disconnect appliances?

We can disconnect and refit a plug-in washing machine, dryer or fridge, and we fit transit bolts where the machine came with them. Anything hardwired or on a gas line has to be done by a licensed trade before we arrive — tell us in the notes and we will remind you in prep week.

Is there anything you will not move?

Fuel, gas cylinders, paint, fireworks and other flammables cannot travel on the truck. Pets, house plants and anything you would be devastated to lose — passports, jewellery, medication, hard drives — are best in your own car. Pianos, safes and large aquariums are moved, but only after a specialist assessment at quote stage.

Who books the lift and the building forms?

You do, because most buildings will only accept the booking from a resident or tenant. We send you the exact list after the walkthrough: which forms the management office wants, the insurance details they usually ask for, and how long to reserve the service lift for the volume you have.

What if my new place is not ready on the day?

That is what the storage shuttle is for. We load on your original date, hold everything wrapped and inventoried, and deliver when you confirm the new address. The first two weeks of holding are already in the quote, so a short delay costs you nothing extra.